Features 1. Provide remote computer operating software.
Features 2. With communication interfaces such as RS485 and Ethernet.
Features 3. Test steps can be planned through computer software.
Features 4. Can load any power within the rated range with an accuracy of 1kW.
Features 5. Test data can be saved through computer management software.
The load bank is a kind of dummy load. It can simulate the power usage of future equipment or cabinets before the power system is officially put online. It is used to detect the load capacity of UPS and generators. The aging test of the power equipment can also be carried out regularly every 1-2 years after the power system goes online. It is an important detection and maintenance equipment for the load capacity. Load Bank are mainly used in power departments, data centers, technology factories, etc. For places with high requirements on power quality and power systems, the application of load bank can effectively avoid economic losses for enterprises caused by backup unit or power supply failure. It can also It provides a scientifically based acceptance verification method for equipment load capacity testing and backup power engineering.
Copyright © COMPAC Electric MFG. All Rights Reserved.Designed by EBM